Final Report: Rapid repair of levee breaches

Resource Type
Reports
Reference Title
Final Report: Rapid repair of levee breaches
Author/Presenter
Resio, Donald
Bloc, Stanley
Organization/Agency
U.S. Army Corps of Engineers
Southeast Regional Research Initiative
Year
2011
Date
07/28/2011
Abstract/Additional Information

In 2007, the U.S. Department of Homeland Security provided initial funding for the development and demonstration of a Rapid Repair of Levee Breaching concept under its Homeland Security Advanced Research Projects Agency. Following an initial phase with successful concept development and testing, funding for the program was continued and evolved to include multiple components, including the Portable Lightweight Ubiquitous Gasket, the Rapidly Emplaced Protection for Earthen Levees and the Rapidly Emplaced Hydraulic Arch Barrier. Rapid Repair of Levee Breach (RRLB) devices are primarily tubes made of high strength fabrics designed to be partially filled with water and then floated into a levee breach, where they become plugged and stop or greatly reduce water flow through the breach. Initial studies were accomplished at the facilities of the Coastal and Hydraulics Laboratory (CHL), United States Amy Engineer Research and Development Center (ERDC) Vicksburg, Mississippi. These were followed by additional large scale experiments and demonstrations that were successfully completed at the Hydraulic Engineering Research Unit (HERU) in Stillwater, Oklahoma in September 2008. A series of small scale experiments conducted in 2008 and 2009 led to the development of Concepts of Operation for delivering and emplacing RRLB components. In November 2009, the RRLB Team completed another round of large scale experiments and demonstrations at HERU designed to test potential emplacement methods and improvements to previous designs. Following this, efforts were focused on site-selection, design and construction of a large scale Levee Breach Test Facility located at ERDC’s Waterways Experiment Station in Vicksburg, Mississippi. The facility is the only one of its kind in the world and will allow researchers to validate results of small and mid-scale experiments. It could also be used to train RRLB emplacement teams. In December of 2010, a full-scale (40-foot wide) breach with an estimated 2000 cubic feet per second discharge through it was successfully sealed during a public demonstration. The RRLB program is of interest to the sponsors and State and Local government agencies that work within the flood fighting arena.