PINO LAKE DAM - TX03480-2778

Dam Name: PINO LAKE DAM
State: TX
Downstream Hazard Potential: S
Incident Type: Non-Failure
Incident Date: 06/15/1989
Incident Driver: Hydrologic/Flooding
Incident Mechanism 1: Overtopping
Incident Mechanism 2
Incident Mechanism 3
Incident IDTX03480-2778
Incident DescriptionOVERTOPPING
Named Hydrologic Event
EAP Enacted (Y/N) due to Incident
Fatalities (Number)
Number of People Evacuated
Number of Habitable Structures Evacuated
Number of Habitable Structures Flooded
Other Infrastructure Impacts
Economic Damages (in $)
Response
Volume released at failure (ac-ft)
Additional Remarks or Updates
Owner TypeP
Dam TypeRE
Primary Purpose(s)
EAPN
Dam Height33 ft
Max Storage (ac-ft)250.00
Surface Area (acres)22.00
Year Completed1968
NID NumberTX03480
River NameTR-SABANA RIVER
Latitude32.1681
Longitude-98.6749
Year Modified

2005

Regulatory Agency(ies)TCEQ
Incident Time
Incident Duration
Incident Report Produced
Information SourcesTX DEQ
Attachments