Incident ID |
VA003016-3313 |
Dam Name |
REEDY MILLPOND DAM |
Downstream Hazard Potential |
U |
State |
VA |
Incident Date |
05/21/2018 |
Incident Type |
Non-failure |
Incident Driver |
Hydrologic/flooding |
Incident Mechanism 1 |
Spillway Erosion/head Cutting |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
water levels breached the dam and damaged the western wingwalls. Dam had high water levels due to recent heavy rains which engaged the primary spillway (right looking downstream) and auxiliary spillway (left looking downstream). Flow in primary spillwa |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
No |
Fatalities (Number) |
0 |
Number of People Evacuated |
|
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
|
Other Infrastructure Impacts |
|
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
|
Additional Remarks or Updates |
|
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
VA DCR |
Owner Type |
|
Dam Type |
|
Primary Purpose(s) |
|
EAP |
|
Year Completed |
0 |
Year Modified |
0 |
Dam Height |
0 ft |
Max Storage (ac-ft) |
0 ac-ft |
Surface Area (acres) |
0 acres |
River Name |
|
Latitude |
0 |
Longitude |
0 |
Regulatory Agency(ies) |
DEPARTMENT OF CONSERVATION AND RECREATION |
NID Number |
VA003016 |
Attachments |
|