Resource

Navigating Design & Constructability Risks During Construction of Secord Dam

Resource Type
ASDSO Conference Papers
Reference Title
Navigating Design & Constructability Risks During Construction of Secord Dam
Author/Presenter
Reddy, Nisheet
Swarn, Chetan
Servinski, Zachary
Friedle, Rusty
Organization/Agency
Association of State Dam Safety Officials
Publisher Name
Association of State Dam Safety Officials
Year
2025
Date
09/21/2025
Event Name
Dam Safety 2025
Event Location
Cleveland, Ohio
ASDSO Session Title
Session 10: Construction: Alternative Delivery and Construction Risks
Topic Location
Michigan
Abstract/Additional Information

Secord Dam, built in the 1920s for hydropower and recreation, required major rehabilitation after the 2020 flood event which caused catastrophic failure (breach) of downstream dams (Edenville and Sanford), which revealed insufficient hydraulic capacity and structural deficiencies at Secord Dam. Key challenges included outdated design standards, lack of as-builts, complex geometry, limited access, and the need to maintain flows during construction. A phased approach was used to reduce design and construction risk, including river rerouting, staged embankment & spillway restoration, and real-time monitoring. The main structural challenge—the right training wall—was addressed using tiebacks, micropiles, pile caps, and supported by temporary external bracing. During construction, the original weir design proved unworkable due to spatial and thermal constraints, leading to a revised multi-lift concrete approach with dowels. Continuous coordination among the design team, contractor, and owner enabled real-time problem-solving, design flexibility, and safe prestressing of a century-old structure, ultimately enhancing dam safety and resilience. This paper presents the lessons learned from navigating design and constructability risks during the Secord Dam rehabilitation, with a focus on structural stability, sequencing, and collaboration between the owner, engineer, and contractor.