Design considerations for impounding at Site C, Canada
Resource Type
Industry Papers and Articles
Reference Title
Design considerations for impounding at Site C, Canada
Organization/Agency
International Commission on Large Dams
International Association for Hydraulic Research
International Commission on Irrigation and Drainage
International Hydropower Association
Publisher Name
Aqua-Media International
Year
2019
Journal Title
International Journal on Hydropower and Dams
ISBN/ISSN
ISSN: 1352-2523
Abstract/Additional Information
This paper outlines layout and design considerations for reservoir impounding at the Site C Clean Energy Project. The diversion scheme includes two fully submerged 10.8 m-diameter diversion tunnels with gated inlet structures. The capacity of the diversion tunnels needs to be reduced prior to impoundement to allow the reservoir to fill with normal inflows from upstream. The inlet closure gates are not capable of safely restricting flows, so methods of maintaining minimum downstream environmental flow releases of 390 m3/s and providing adequate energy dissipation during reservoir filling were examined.