Resource
Crossing the lines on the Nelson Mandela bridge
Resource Type
Industry Papers and Articles
Reference Title
Crossing the lines on the Nelson Mandela bridge
Publisher Name
The Concrete Society
Year
2003
Journal Title
Concrete Engineering International
Journal Volume
7
Journal Issue
3
ISBN/ISSN
ISSN: 1460-5856
Abstract/Additional Information
A discussion about the construction of the new 284m long cable-stayed Nelson Mendela bridge is presented. The dominant visual features and a key engineering aspect of the bridge are four tubular steel concrete-filled pylons. These pylons are mounted on large concrete support cones designed to cope with the high bursting stresses generated by the bridge design.