Effective Automated Surveillance Requires Effort (J. R. Baker and R. A. Stewart)
Maintenance Issues with RCC Dams, Then and Now (R. P. Bass)
Coatings For Use On Damp Or Wet Steel Surfaces (A. D. Beitelman)
Tainter Gate Inspection for the FERC Part 12 Inspection of Morony Dam (S. A. Benson)
Engineering-Oriented Underwater Inspections of Dams (B. H. Carter and R. L. Harris)
Boundary Dam Special Review and Instrumentation Upgrades (R. G. Charlwood, J. Rutherford, A. Feldman and W. Davis)
Replacement of Corroded Members in Tainter Spilllway Gates (M. A. Cones, J. V. Peyton and J. E. Rose)
Inspection of Spillway Radial Gates: An Eye Opening Experience (T. E. Duncan and W. D. Edwards)
Evaluation of the Condition of Two Faced Embankment Dams In Colorado (J. W. France, S. A. Todaro and R. W. Kramer)
Wirtz Dam Post-Tensioned Anchoring Project Issues Affecting the Performance of Epoxy-Coated Tendons (R. Frithiof and P. Krumm)
Gate and Valve Inspections and Safety Concerns (L. C. Gergig and S. K. Miller)
Underwater Placement of Concrete to Repair Voids found Upstream of Caddo Dam Control Structure and Weir (D. Goss and E. Woerner)
Recovering from a 20,000 cubic yard mudslide at Tacoma Power's Cushman #2 powerhouse and switchyard (S. A. Hahn)
Drift & Debris Management at Bluestone Lake (K. C. Halstead and D. Werth)
Monitoring and Remediation of Reservoir Rim Leakage at TVA's Tims Ford Dam (J. A. Hamby and D. A. Bruce)
Evaluation of Inlet/Outlet Works Mechanical Equipment and Design Concepts Olivenhain Dam (S. J. Hayes, M. A. Hammer and D. P. Thompson)
Mississinewa Dam Settlement Investigation and Remediation (K. E. Henn III, S. T. Hornback and L. C. Davis)
Stabilization of Landslide Above Pine Flat Power Plant Pine Flat Dam, California (J. M. Herbert and D. K. Rogers)
Quality Management in the Periodic Inspection Process (J. Hovell, L. Holden, E. Sing and J. Yip)
Inspection and Treatment of Surficial Conditions of Several Concrete Gravity Dams (W. H. Hover, A. B. Bjarngard and K. M. Flood)
Installation of Relief Wells at Grenada Lake Outlet Structure Grenada, Mississippi (M. K. Klaus and E. Woerner)
Dam O & M issues - our survival? (R. W. Kramer)
The Inspection and Rehabilitation of Corrugated Metal Pipes Used in Embankment Dams (J. R. Kula, G. Zamensky and T. J. King)
Operation of an Automated Instrumentation and Dam Safety Monitoring System (G. Lawton, J. Paxton, D. Hughes and T. Linville)
Seismic Stability of New Exchequer Dam and Gated Spillway Structure (F. I. Makdisi, Z.-L. Wang and W. D. Edwards)
Estimating Life Loss For Dam Safety and Risk Assessment: Lessons From Case Histories (D. M. McClelland and D. S. Bowles)
Seepage Problems In Dams Related To Early Construction Practices (R. A. McManus and C. S. Ahlgren)
Environmentally Acceptable Lubricants (J. S. Micetic)
Ambient Vibration Tests of a Modern Arch Dam; Some Proposals for Method of Data Processing (M. R. Mivehchi, M. T. Ahmadi and A. Hajmomeni)
Camino Reservoir Sediment Removal (C. J. Moffitt)
Cedar Falls Intake Rehabilitation (M. Moosavi and W. Davis)
Integration of Remote Monitoring System at Deadwood Dam into Emergency Action Planning Decision Criteria (J. A. Mumford)
Maintenance of a Spillway and Dam Foundation Suspected of Piping (A. M. Oskoorouchi, P. J. Lane and D. F. Hermann)
Ross Lake Maintenance Facility - A Unique Floating Structure (D. K. O'Sullivan)
Implementing Data Acquisition, Storage, and Retrieval Tachnologies In Dam Safety Practice (T. Plummer and K. Hardin)
Evaluation of Spilllway Radial Gates Throughout PG&E Hydro System (G. Reichert, E. Chan, M. Aslam and H. Martinez)
Outlet Pipe Gone Bad- Emergency Investigation and Remedial Repair of Lenihan Dam Outlet (G. Reichert, R. L. Volpe, D. Hook, R. Tepel, J. Nelson, Y. Tilden and T. Grifoni)
Camino Penstock Stabiliztion, El Dorado County, California (D. K. Rogers, C. J. Moffitt, R. E. Goodman, R. C. Harlan and R. Hall)
Tainter Gate Operation and Maintenance (B. T. A. Sagar and C. C. Hutton)
Dam Safety Program Performance Measures Version 4 (T. Schmidt)
Operating With New Ramping Rates at Tacoma Power's Nisqually Project (B. S. Scott, S. H. Vischer and R. L. Bachman)
From Potential Failure Mode Identification to Emergency Action Considerations: Risk Reduction Through Comprehensive Facility Reviews (G. A. Scott)
The use of Synthetic Geomembranes in O & M of Dams (A. M. Scuero, G. L. Vaschetti and J. A. Wilkes)
Emergency Rehabilitation of Sector Gate Guide Rollers at the Chicago River Lock (H. W. Stewart)
Instrumentation Evaluation for the Tennessee-Tombigbee Waterway: Jamie L. Whitten Lock and Dam (M. Sundaram, R. Chamlee and D. Tashbin)
Byllesby and Buck Hydroelectric Project Head Gates: Repair or Replace (J. R. Thrasher and J. P. Davis)
Dam O & M issues - the challenge of the 21st century : 20th annual USCOLD lecture series, Seattle, Washington, July 10-14, 2000 (U.S. Committee on Large Dams)
LENIHAN DAM - EMERGENCY ACTION PLAN AND RESPONSE (R. L. Volpe, B. Fields and D. Hook)
Automated Instrumentation System for Lenihan Dam (R. L. Volpe, J. L. Nelson and J. N. Schuyler)
Spillway Modifications at French Meadows Reservoir Placer County, California (D. L. Wade, D. K. Rogers, J. M. Mattson, J. J. Cassidy and R. C. Harlan)
RESERVOIR OPERATIONS & CONSTRAINTS OF AN AGING SYSTEM MUSKINGUM WATERSHED, 1935-PRESENT (J. W. Webb)
Successes and Failures of Instrumentation Programs (D. B. Wilson and R. T. Saber)