UPPER SALT CREEK 18-9 - NE00528-3031
Dam Name: UPPER SALT CREEK 18-9
State: NE
Downstream Hazard Potential: L
Incident Type: Failure
Incident Date: 06/05/2015
Incident Driver: Seepage/Internal Erosion
Incident Mechanism 1: Spillway Pipe Failure
Incident Mechanism 2Piping
Incident Mechanism 3
Incident IDNE00528-3031
Incident DescriptionCorrugated metal pipe conduit failed due to corrosion. Failure of the conduit led to internal erosion of the dam.
Named Hydrologic Event
EAP Enacted (Y/N) due to IncidentNo
Fatalities (Number)0
Number of People Evacuated0
Number of Habitable Structures Evacuated0
Number of Habitable Structures Flooded0
Other Infrastructure ImpactsRoads
Economic Damages (in $)$100,000 to $500,000
Response
Volume released at failure (ac-ft)40
Additional Remarks or Updates$150,000 to rebuild dam/road
Owner TypeL
Dam TypeRE
Primary Purpose(s)O
EAPNR
Dam Height23 ft
Max Storage (ac-ft)91.00
Surface Area (acres)6.00
Year Completed1960
NID NumberNE00528
River NameTR-S BR SALT CREEK
Latitude40.5814
Longitude-96.6754
Year Modified
Regulatory Agency(ies)NE DNR
Incident Time8:00 AM
Incident Duration
Incident Report ProducedNo
Information SourcesNeDNR