LAKEWIND DAM - SC00044-3117

Dam Name: LAKEWIND DAM
State: SC
Downstream Hazard Potential: S
Incident Type: Failure
Incident Date: 09/16/2018
Incident Driver: Hydrologic/Flooding
Incident Mechanism 1: Piping
Incident Mechanism 2Spillway Pipe Failure
Incident Mechanism 3
Incident IDSC00044-3117
Incident DescriptionPrimary spillway riser had been removed prior to Hurricane Florence (without a permit/approval from the State) and pond was drained.  Heavy precipitation on the watershed over approximately 72 hours completely filled the impoundment and caused overtopping of the dam.  The breach occurred in line with the primary spillway barrel, and breach sides are near vertical, indicating a piping failure that likely occurred after water level had receded from overtopping.
Named Hydrologic EventHurricane Florence
EAP Enacted (Y/N) due to IncidentNo
Fatalities (Number)0
Number of People Evacuated0
Number of Habitable Structures Evacuated0
Number of Habitable Structures Flooded0
Other Infrastructure Impacts
Economic Damages (in $)
ResponseState Dam Safety Program performed a full inspection following the breach of this dam. The inspection report will contain a requirement that the Owner hire an engineer and submit either a permit application for repair or removal of the dam.
Volume released at failure (ac-ft)
Additional Remarks or UpdatesReport on dam failures associated with Hurricane Florence to be released by Geotechnical Extreme Event Reconnaisance (GEER) group at some point in the future. GEER team field work occurred during month of September 2018.
Owner TypeP
Dam TypeRE
Primary Purpose(s)R
EAPY
Dam Height24 ft
Max Storage (ac-ft)173.00
Surface Area (acres)17.00
Year Completed1900
NID NumberSC00044
River NameCREWS BRANCH
Latitude34.7336
Longitude-80.1717
Year Modified
Regulatory Agency(ies)SC DHEC
Incident Time
Incident Duration
Incident Report Produced
Information SourcesSC Dam Safety
Attachments