FINCH'S MILLPOND - NC00891-2645


Incident ID NC00891-2645
Dam Name FINCH'S MILLPOND
Downstream Hazard Potential S
State NC
Incident Date 11/28/2015
Incident Type Failure
Incident Driver Deterioration Or Poor Condition
Incident Mechanism 1 Erosion
Incident Mechanism 2
Incident Mechanism 3
Incident Description Erosion over the years led to collapse of a portion of the dam
Named Hydrologic Event
EAP Enacted (Y/N) due to Incident
Fatalities (Number)
Number of People Evacuated
Number of Habitable Structures Evacuated
Number of Habitable Structures Flooded
Other Infrastructure Impacts
Economic Damages (in $)
Volume released at failure (ac-ft)
Response
Additional Remarks or Updates Co. EMA said poor maintenance over the years led to erosion to the point where a portion of the dam collapsed. The County EMA Director indicated pond has drained into the creek below
Incident Time
Incident Duration
Incident Report Produced
Information Sources Local News Source The Wilson Times
Owner Type P
Dam Type RE
Primary Purpose(s) R
EAP N
Year Completed 1924
Year Modified 0
Dam Height 15 ft
Max Storage (ac-ft) 469 ac-ft
Surface Area (acres) 0 acres
River Name BLOOMERY SWAMP
Latitude 35.763
Longitude -77.997
Regulatory Agency(ies) NCDENR
NID Number NC00891
Attachments Y