Incident ID |
OH01047-3267 |
Dam Name |
PRIDE VALLEY LAKE DAM |
Downstream Hazard Potential |
L |
State |
OH |
Incident Date |
08/20/2018 |
Incident Type |
Non-failure |
Incident Driver |
Deterioration Or Poor Condition |
Incident Mechanism 1 |
Spillway Pipe Failure |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
The principal spillway riser failed. |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
No |
Fatalities (Number) |
0 |
Number of People Evacuated |
0 |
Number of Habitable Structures Evacuated |
0 |
Number of Habitable Structures Flooded |
0 |
Other Infrastructure Impacts |
|
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
ODSP staff made site visits to assist owner. Owner actually had approved plans to replace the principal spillway prior to incident. Owner had contractor come in and temporarily breach the dam. Replaced the spillway in the summer of 2019. |
Additional Remarks or Updates |
|
Incident Time |
|
Incident Duration |
1 week |
Incident Report Produced |
No |
Information Sources |
OH DNR |
Owner Type |
P |
Dam Type |
RE |
Primary Purpose(s) |
R |
EAP |
N |
Year Completed |
1957 |
Year Modified |
0 |
Dam Height |
26 ft |
Max Storage (ac-ft) |
56 ac-ft |
Surface Area (acres) |
6 acres |
River Name |
TRIBUTARY TO ARMSTRONG RUN |
Latitude |
40.7083 |
Longitude |
-81.17 |
Regulatory Agency(ies) |
DEPARTMENT OF NATURAL RESOURCES |
NID Number |
OH01047 |
Attachments |
|