June 14, 2022
12:00 Pm - 2:00 PM Eastern
Watershed Rehab Program Overview
- Background and history
- Description of NRCS rehabilitation phases – Planning, Design, Construction
Planning Requirements
- Dam Assessment Report
- Review of Available Documents
- Visual Inspection
- HH revisions
- Dam Break Inundation Analyses / PAR worksheet
- Dam/Spillway Alternatives Analyses
- Plan Environmental Document (Plan-ED) (-EA, -EE, -EIS)
- Engineering
- Environmental and Cultural Resources
- Economic
- Alternatives
- Public Participation
Design Requirements
- Experience with NRCS review process, requirements
- Considerations for establishing the design and review schedule
- Design Guidance Overview (directives):
- TR-60 and other TR’s
- NEM’s, NEH’s
- Design Document Deliverables and Construction Considerations
- Design Report
- GER, SMR, HH,
- Operation and Maintenance Manual and Agreement
- Landrights, easements, figures
- Construction Drawings
- General requirements for drawings
- Standard Dwgs. – Risers, impact basins, etc.
- (Structural Drawings – Rebar schedule, standard details
- Technical Specifications
- NRCS standard specification editing process
- Items of Work
- Bid Documents
- Bid Schedule
- EOCC
- Construction Schedule
- Design Report
- Case Studies / Project Examples
- Beaver Creek 1
- Bull Creek 12
- Settingdown Creek
- (others to be added or substitute the above)
- Closing Remarks, Questions