Resource
The future of dams and their reservoirs:
Remediation of Unmun Dam by compaction grouting (K. Ivanetich, F. Gularte, L. Shao and R. H. Borden)
Sediment impacts related to removal of Savage Rapids Dam (T. Randle and J. A. Bountry)
The future of dams and their reservoirs (U.S. Society on Dams)
Performance evaluation of Waterbury Dam (R. T. Saber, D. B. Wilson, A. P. Barranco Jr., R. B. Finucane and M. R. Snyder)
Dam safety program management tools (DSPMT) (T. Schmidt and M. Grounds)
Leyden Dam: Modifying an existing irrigation storage facility to provide urban flood protection (M. T. Zusi, S. A. Todaro and D. Lloyd)
Water quality planning optimizes costs and impacts permitting multipurpose operations at the Olivenhain Reservoir (J. Zhou, W. K. Miller, K. Steele, M. T. Stift and H. Ehrlich)
Fish passage and entrainment at the Bureau of Reclamation's dams and diversions (D. Weigmann, L. Helfrich, C. Karp, B. Mefford and D. Portz)
Assessment and repair of a hydroelectric power plant concrete dam damage after 43 years of operation (K. F. Portella, C. M. Garcia, M. P. Cantao, G. P. de Souza, V. S. Filha, E. S. Ferreira, J. R. G. Nogueira and J. C. Biondi)
Instrumentation for the Winfield additional lock (T. Plummer and D. Gunderson)
Suggested construction limitations around existing dams (R. L. Jernigan, S. A. Anderson and J. H. Weldon)
Handling uncertainty in dam safety decision-making (D. N. D. Hartford and R. A. Stewart)
Post-tensioned anchors using epoxy coated strand for rehabilitation of concrete dams (L. Bogdan)
Pine Hollow Reservoir - A proposed off-stream storage project (C. M. Urlich, C. B. Turnbull, F. Marshall and G. Marshall)
Fish friendly hydroelectric project development, An Alaskan success story (J. Thrall and J. Morsell)
Historic dam - Modern upgrade (G. M. Taylor, D. Mahooty and J. Rayssiguier)
Slicing concrete to improve dam safety (P. F. Shiers, B. N. Mochrie, M. D. Buratto and B. E. Oxendine)
The ABCs of ACBs - An assessment of articulating concrete blocks for embankment overtopping protection (P. G. Schweiger and R. E. Holderbaum)
Nevada Creek Dam rehabilitation - Save your old spillway for a very rainy day (J. Sanders, K. Smith and J. H. Thom)
Constructing knowledge on American dam removals (M. Pohl)
Installing high capacity rock anchors to meet stability requirements (A. W. Plizga, P. F. Shiers, S. W. Schadinger and J. Lyon)
Removal of the water treatment plant of Lake Camelot embankment dam, housed in downstream shell (A. M. Oskoorouchi and J. P. Sawyer)
Prelude to removal - Elwha River dams (J. A. Mumford and R. Parker)
Rehabilitation of a high mountain dam subjected to frequent overtopping events (M. Miller, D. R. Birch, D. Johnson and B. Stoddard)
Liquefaction mitigation of a silty dam foundation using vibro-stone columns and drainage wicks: A case history at Salmon Lake Dam (R. Luehring, N. Snorteland, M. Stevens and L. Mejia)
Environmental impact in the design and construction of the Judy Reservoir enlargement project, Washington (G. Lawton, J. Davis, R. B. Powell and M. Barkau)
Seismic risk analysis of Monticello Dam based on a nonlinear finite element model (R. Koltuniuk and L. K. Nuss)
A non-rigorous approach for the evaluation of non-linear behavior expected to occur in a thin, reinforced concrete, multiple-arch dam (C. M. Knarr, D. L. Millikan and Z. H. Duron)
Discovery, assessment and treatment of sinkholes at Horsetooth Dam (A. H. Kiene, R. M. Pearson and R. L. Torres)
Design, permitting and construction of the breaching of the Old Berkshire Mill Dam (W. H. Hover and C. W. Cox)
Ten miles to Whiskeytown - The removal of Saeltzer Dam (T. E. Hepler)
Evolution of the Tolt Dam failure warning system (L. Harrington, A. Durham and D. Huang)
Proposed Matilija Dam removal sediment management, removal and disposition alternatives (E. Hall)
Technical issues in small dam removal engineering (B. E. Graber, M. Bowman, R. S. Carney, M. W. Doyle, M. Fisher, S. D. Mackey and L. Wildman)
Proposed decommissioning of Jessup Mill Dam (J. W. France, M. R. May and L. Schneller)
Long Park Dam rehabilitation: Design and construction of seepage control system (M. Forrest, J. Roadifer and W. Leeflang)
Slurry trench construction of a vertical foundation filter at Wasco Dam (G. Fisk, J. Gagliardi and S. Day)
Evaluation of foundation and buttress sliding stability for Florence Lake Dam, California (K. Ferguson, D. D. Boyer, D. Millikan and C. M. Knarr)
Assessing the dam safety risks of the Horsetooth Reservoir dams (W. O. Engemoen)
Design of modern earth and rockfill dams to optimize available resources (J. L. Ehasz)
Maximizing resources and assets to optimize meeting needs (T. Coulter, D. Larsen and P. Mangan)
Dam removal success stories - Lessons learned from previous dam removal experiences (S. Cantrell)
Issues to consider in deciding whether or not to remove a dam (M. Bowman, S. Higgs and B. E. Graber)
The seismic stability of Cobble Mountain Dam, Russell, Massachusetts (S. M. Bemben, W. S. Zoino and W. H. Hover)
RCC Construction - Acceptable means and methods (R. P. Bass)
Evaluation of the removal of the Lower Snake River dams (J. D. Barton)
Improving water quality at Denver Water's Ralston Reservoir using spillway energy dissipation techniques (J. M. Barbier, H. T. Falvey and S. A. Todaro)
Rehabilitation of the outlet works at Arrowrock Dam (R. M. Arrington, J. P. Kubitschek and R. K. McGovern)