UPPER CANDOR DAM - NY00938-1282
Dam Name: UPPER CANDOR DAM
State: NY
Downstream Hazard Potential: L
Incident Type: Non-Failure
Incident Date: 08/28/2011
Incident Driver: Hydrologic/Flooding
Incident Mechanism 1: Piping
Incident Mechanism 2
Incident Mechanism 3
Incident IDNY00938-1282
Incident DescriptionSeepage/ piping in dam foundation seems to have increased and dam may have settled.
Named Hydrologic EventIrene
EAP Enacted (Y/N) due to IncidentNo
Fatalities (Number)
Number of People Evacuated
Number of Habitable Structures Evacuated
Number of Habitable Structures Flooded
Other Infrastructure Impacts
Economic Damages (in $)
Response
Volume released at failure (ac-ft)
Additional Remarks or Updates
Owner TypeL
Dam Type
Primary Purpose(s)O
EAPN
Dam Height7 ft
Max Storage (ac-ft)55.00
Surface Area (acres)11.00
Year Completed1920
NID NumberNY00938
River NameCATATONK CREEK
Latitude42.235
Longitude-76.3428
Year Modified
Regulatory Agency(ies)NYS DEC
Incident Time
Incident Duration
Incident Report Produced
Information Sources