Incident ID |
MA01535-3009 |
Dam Name |
CROSBY POND DAM |
Downstream Hazard Potential |
S |
State |
MA |
Incident Date |
05/29/2015 |
Incident Type |
Failure |
Incident Driver |
Unknown |
Incident Mechanism 1 |
Unknown |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
The uncontrolled release of the impoundment inundated a heavily traveled road. Nobody was injured, the busy road was closed all day creating significant traffic delay issues. |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
|
Fatalities (Number) |
|
Number of People Evacuated |
|
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
|
Other Infrastructure Impacts |
Roads |
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
|
Additional Remarks or Updates |
The uncontrolled release of the impoundment inundated a heavily traveled road. Nobody was injured, the busy road was closed all day creating significant traffic delay issues. |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
|
Owner Type |
P |
Dam Type |
|
Primary Purpose(s) |
R |
EAP |
NR |
Year Completed |
1900 |
Year Modified |
0 |
Dam Height |
9 ft |
Max Storage (ac-ft) |
30 ac-ft |
Surface Area (acres) |
0 acres |
River Name |
MILL BROOK |
Latitude |
42.4503 |
Longitude |
-71.3239 |
Regulatory Agency(ies) |
Office of Dam Safety |
NID Number |
MA01535 |
Attachments |
|