Incident ID |
NC00021-1683 |
Dam Name |
MORRIS DAM |
Downstream Hazard Potential |
S |
State |
NC |
Incident Date |
06/07/2013 |
Incident Type |
Non-failure |
Incident Driver |
Hydrologic/flooding |
Incident Mechanism 1 |
Overtopping |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
Dam overtopped during passage of TD Andrea |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
No |
Fatalities (Number) |
|
Number of People Evacuated |
0 |
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
0 |
Other Infrastructure Impacts |
None |
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
0 ac-ft |
Response |
|
Additional Remarks or Updates |
An auxilary relief channel had to be excavated through an abutment. Threatened Swanns Station Road downstream from Dam |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
|
Owner Type |
P |
Dam Type |
RE |
Primary Purpose(s) |
P |
EAP |
N |
Year Completed |
0 |
Year Modified |
0 |
Dam Height |
12 ft |
Max Storage (ac-ft) |
153 ac-ft |
Surface Area (acres) |
0 acres |
River Name |
JUNIPER CREEK |
Latitude |
35.379 |
Longitude |
-79.132 |
Regulatory Agency(ies) |
|
NID Number |
NC00021 |
Attachments |
|