Incident ID |
OH00446-2180 |
Dam Name |
LAKE WHITE DAM |
Downstream Hazard Potential |
H |
State |
OH |
Incident Date |
08/29/2014 |
Incident Type |
Non-failure |
Incident Driver |
Unknown |
Incident Mechanism 1 |
Under Investigation |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
Seepage adjacent to the spillway was noted by Park staff on 8/29/14. The lake was drawndown and ODNR engineers and consultant are investigating the cause. |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
Yes |
Fatalities (Number) |
|
Number of People Evacuated |
0 |
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
0 |
Other Infrastructure Impacts |
Roads |
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
|
Additional Remarks or Updates |
State Route 104 over the dam was closed |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
|
Owner Type |
S |
Dam Type |
RE |
Primary Purpose(s) |
R |
EAP |
Y |
Year Completed |
1935 |
Year Modified |
0 |
Dam Height |
39 ft |
Max Storage (ac-ft) |
7633 ac-ft |
Surface Area (acres) |
400 acres |
River Name |
PEE PEE CREEK |
Latitude |
39.1 |
Longitude |
-83 |
Regulatory Agency(ies) |
DEPARTMENT OF NATURAL RESOURCES |
NID Number |
OH00446 |
Attachments |
|