Incident ID |
PA00000-3225 |
Dam Name |
WINANS |
Downstream Hazard Potential |
L |
State |
PA |
Incident Date |
04/01/2015 |
Incident Type |
Non-failure |
Incident Driver |
Deterioration Or Poor Condition |
Incident Mechanism 1 |
Spillway Pipe Failure |
Incident Mechanism 2 |
Sinkhole |
Incident Mechanism 3 |
|
Incident Description |
CMP PRINCIPAL SPILLWAY PIPES SEPARATED RESULTING IN LARGE ERODED HOLE ON THE DOWNSTREAM SLOPE. |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
|
Fatalities (Number) |
0 |
Number of People Evacuated |
0 |
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
|
Other Infrastructure Impacts |
|
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
PRIMARY SPILLWAY PLUGGED, FLOW DIVERTED TO AUXILIARY PIPES, & REPAIR PLAN PREPARED. |
Additional Remarks or Updates |
VERY PROMPT REPAIR PLAN SUBMITTED AND WORK COMPLETED BY THE END OF 2015. |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
PA Dam Safety |
Owner Type |
P |
Dam Type |
RE |
Primary Purpose(s) |
R |
EAP |
|
Year Completed |
0 |
Year Modified |
0 |
Dam Height |
10 ft |
Max Storage (ac-ft) |
0 ac-ft |
Surface Area (acres) |
0 acres |
River Name |
SPRING RUN |
Latitude |
41.4112 |
Longitude |
-79.4619 |
Regulatory Agency(ies) |
PADEP |
NID Number |
PA00000 |
Attachments |
|