MARIANO BORO. INTAKE DAM - PA00000-3241


Incident ID PA00000-3241
Dam Name MARIANO BORO. INTAKE DAM
Downstream Hazard Potential L
State PA
Incident Date 12/01/2010
Incident Type Failure
Incident Driver Deterioration Or Poor Condition
Incident Mechanism 1 Overtopping
Incident Mechanism 2
Incident Mechanism 3
Incident Description CONCRETE DAM FAILED ON RIGHT ABUTMENT. EROSION ALONG DAM WAS A THREAT TO ADJACENT STATE ROAD.
Named Hydrologic Event
EAP Enacted (Y/N) due to Incident No
Fatalities (Number) 0
Number of People Evacuated 0
Number of Habitable Structures Evacuated
Number of Habitable Structures Flooded
Other Infrastructure Impacts
Economic Damages (in $)
Volume released at failure (ac-ft)
Response POOL DRAWN DOWN WITH PUMPS. EMERGENCY PERMIT REPAIRS BY BORO USED CONCRETE BAGS & REBAR.
Additional Remarks or Updates IN 2016 PENNDOT REPAIRED DAM, BUT DOWNSTREAM SLOPE FAILED AGAIN. BREACH OF DAM IS PENDING AS OF 2018.
Incident Time
Incident Duration
Incident Report Produced
Information Sources PA Dam Safety
Owner Type L
Dam Type CN
Primary Purpose(s) S
EAP
Year Completed 0
Year Modified 0
Dam Height 6 ft
Max Storage (ac-ft) 0 ac-ft
Surface Area (acres) 0 acres
River Name TENMILE CREEK
Latitude 40.011
Longitude -80.0542
Regulatory Agency(ies) PADEP
NID Number PA00000