Incident ID |
TX00000-216 |
Dam Name |
TYLER STATE PARK |
Downstream Hazard Potential |
|
State |
TX |
Incident Date |
09/12/1963 |
Incident Type |
Failure |
Incident Driver |
Unknown |
Incident Mechanism 1 |
Unknown |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
|
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
No |
Fatalities (Number) |
|
Number of People Evacuated |
|
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
1 |
Other Infrastructure Impacts |
|
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
|
Additional Remarks or Updates |
Faulty Construction. Lake emptied, sending water across a vast area. No injuries, one home damaged. Officials at the time determined the dam failed due to a large drain being placed in the middle of the dam. The dam was replaced. In 2009, the dam needs costly repairs again de |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
|
Owner Type |
|
Dam Type |
|
Primary Purpose(s) |
|
EAP |
|
Year Completed |
0 |
Year Modified |
0 |
Dam Height |
0 ft |
Max Storage (ac-ft) |
0 ac-ft |
Surface Area (acres) |
0 acres |
River Name |
|
Latitude |
0 |
Longitude |
0 |
Regulatory Agency(ies) |
|
NID Number |
TX00000 |
Attachments |
|