Incident ID |
TX07084-3604 |
Dam Name |
BALDWIN DAM |
Downstream Hazard Potential |
H |
State |
TX |
Incident Date |
05/02/2024 |
Incident Type |
Non-failure |
Incident Driver |
Hydrologic/flooding |
Incident Mechanism 1 |
Spillway Erosion/head Cutting |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
Spring rains caused erosion in the spillway and overtopped/failed a downstream road |
Named Hydrologic Event |
Texas Severe Storms, Straight-line Winds, Tornadoes, and Flooding (DR-4781-TX) |
EAP Enacted (Y/N) due to Incident |
Yes |
Fatalities (Number) |
|
Number of People Evacuated |
|
Number of Habitable Structures Evacuated |
|
Number of Habitable Structures Flooded |
|
Other Infrastructure Impacts |
Roads/Bridges |
Economic Damages (in $) |
Unknown |
Volume released at failure (ac-ft) |
|
Response |
Owner contacted local EMC when water was within 5-ft of the crest, residents downstream evacuated |
Additional Remarks or Updates |
Road immediately downstream of the dam washed out, TCEQ inspected; spillway is likely undersized; dam owner has not been able to find a PE to work with him. |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
Yes |
Information Sources |
TCEQ |
Owner Type |
P |
Dam Type |
RE |
Primary Purpose(s) |
R |
EAP |
N |
Year Completed |
0 |
Year Modified |
0 |
Dam Height |
20 ft |
Max Storage (ac-ft) |
56 ac-ft |
Surface Area (acres) |
7 acres |
River Name |
PRAIRIE BRANCH |
Latitude |
30.6786 |
Longitude |
-95.5375 |
Regulatory Agency(ies) |
TCEQ |
NID Number |
TX07084 |
Attachments |
|