Incident ID |
WA00143-2261 |
Dam Name |
DESCHUTES DAM |
Downstream Hazard Potential |
L |
State |
WA |
Incident Date |
10/04/2014 |
Incident Type |
Non-failure |
Incident Driver |
Malfunction Of Equipment/gate |
Incident Mechanism 1 |
Gate/valve Failure |
Incident Mechanism 2 |
|
Incident Mechanism 3 |
|
Incident Description |
The east gate of the dam unexpectedly failed to close during the early morning hours of 10-04-14 dewatering most of the south and middle basins of the lake before staff could respond. |
Named Hydrologic Event |
|
EAP Enacted (Y/N) due to Incident |
|
Fatalities (Number) |
0 |
Number of People Evacuated |
0 |
Number of Habitable Structures Evacuated |
0 |
Number of Habitable Structures Flooded |
0 |
Other Infrastructure Impacts |
|
Economic Damages (in $) |
|
Volume released at failure (ac-ft) |
|
Response |
|
Additional Remarks or Updates |
After research and testing, the owner believes it was caused by an intermittent degraded electrical connection on the low voltage control wiring for the East Gate |
Incident Time |
|
Incident Duration |
|
Incident Report Produced |
|
Information Sources |
|
Owner Type |
S |
Dam Type |
RE |
Primary Purpose(s) |
R |
EAP |
NR |
Year Completed |
1951 |
Year Modified |
0 |
Dam Height |
45 ft |
Max Storage (ac-ft) |
4300 ac-ft |
Surface Area (acres) |
270 acres |
River Name |
DESCHUTES RIVER |
Latitude |
47.0435 |
Longitude |
-122.909 |
Regulatory Agency(ies) |
Washington, Dept of Ecology |
NID Number |
WA00143 |
Attachments |
Y |