RABEL DAM - WA00308-2263


Incident ID WA00308-2263
Dam Name RABEL DAM
Downstream Hazard Potential S
State WA
Incident Date 08/21/2014
Incident Type Non-failure
Incident Driver Hydrologic/flooding
Incident Mechanism 1 Overtopping
Incident Mechanism 2
Incident Mechanism 3
Incident Description Fire-swept Benson Creek watershed received from 0.4 to 0.9 inches of rain in a one-hour period. Debris blocked the spillway and caused the reservoir to fill and overtop the dam.
Named Hydrologic Event
EAP Enacted (Y/N) due to Incident
Fatalities (Number) 0
Number of People Evacuated 0
Number of Habitable Structures Evacuated 0
Number of Habitable Structures Flooded 0
Other Infrastructure Impacts
Economic Damages (in $) None
Volume released at failure (ac-ft)
Response
Additional Remarks or Updates Active intervention by the dam owners re-opened the spillway in time to prevent further damage to the dam and spillway. See the attached incident report.
Incident Time
Incident Duration
Incident Report Produced Yes
Information Sources
Owner Type P
Dam Type RE
Primary Purpose(s) R
EAP N
Year Completed 1940
Year Modified 1992
Dam Height 24 ft
Max Storage (ac-ft) 150 ac-ft
Surface Area (acres) 11 acres
River Name TR-BENSON CREEK
Latitude 48.3228
Longitude -119.998
Regulatory Agency(ies) Washington, Dept of Ecology
NID Number WA00308
Attachments Y