The Floating Bulkhead: A Practical, Flexible, and Economical Approach to Dewatering Gates

Resource Type
ASDSO Conference Papers
Reference Title
The Floating Bulkhead: A Practical, Flexible, and Economical Approach to Dewatering Gates
Author/Presenter
Goodwin, Christopher
Rudolph, Todd
Organization/Agency
Association of State Dam Safety Officials
Publisher Name
Association of State Dam Safety Officials
Year
2018
Date
September 9-13, 2018
Event Name
Dam Safety 2018 - 35th Annual Conference
Event Location
Seattle, Washington
ASDSO Session Title
Spillway Rehabs
ISBN/ISSN
ISSN: 1526-9191 (Hardcopy)
Abstract/Additional Information

Many dams have some type of gate(s) to pass water either for dewatering, normal river flows, or flood flows. Many of these gates are over 50 years old and either need maintenance or periodic operation to verify they can be opened during a high flow event. If the dam spillway was not constructed with a stoplog system or other mechanism to separate the gate from the impoundment, the owner’s choices include constructing a costly cofferdam or bulkhead system to dewater the gate, or dewatering the entire reservoir, which is detrimental to any power-generation or irrigation role the dam may play and may also pose environmental and recreational concerns.
In this paper we will describe the general principles behind the design and fabrication of a floating bulkhead, outlining potential cost savings of a floating bulkhead versus traditional bulkhead, and providing varying case studies of spillway configurations to demonstrate the various scenarios in which a floating bulkhead can be placed.